Author: Jenni Valtari
37 posts
Groundbreaking ceremony for new Ohkola hospital
A new forensic psychiatric hospital is under construction next to the existing Ohkola Hospital building in Mäntsälä. The hospital’s foundation stone was laid at 2 p.m. on November 5, 2024.
Excavation work in the Laakso Hospital area is on the final stretch — the site holds a “tarring ceremony”
Excavation work in the Laakso Joint Hospital project is on the final stretch. The project involves unusual underground work — excavation has been effectively coordinated with sensitive hospital operations.
New early-morning detonation slot as of March 25
We are looking for ways to give more time for the prefab installation crew to perform their work and to cause less disruption to customers of the Synapsia Building.
The morning blasting times will change from 18.3.
We are preparing for blasting near the Meilahti Hospital area.
Resident event, 27 February, 6 pm to 7 pm
Construction experts are ready to answer questions and talk about construction of the Laakso Joint Hospital.
The construction of the Meilahti-Laakso tunnel is progressing under Urheilukatu
The bulletin has been distributed to the nearest resident buildings.
Evening blasting time to extend slightly beyond 9 pm
Blasting always ends at 9 pm.
Vibrations and noise from blasting can travel long distances in the bedrock
Perceptible vibrations indoors can feel very unpleasant.
New blasting time from November 27th
See time frames for blasting and other working hours from our web pages.